Search

Search for projects by name or address

Ecosystems
Ecosystem logo
Built on the CDK Erigon stack badgePart of the Agglayer badge

TVS
Activity

TVS by token type

TVS breakdown by token type

ETH & derivatives
8.40%
Stablecoins
69.4%
BTC & derivatives
1.60%
Other
20.5%
Public RWAs
0.00%

TVS by stage

TVS breakdown by stage

Total 7 projects

Stage 0
19.3% (1)
Stage 1
0.00% (0)
Stage 2
0.00% (0)
n/a
80.6% (6)

DA Layers used

Ethereum2 projects
None5 projects

Blobs posted

335.75 MiB


7.49% of total blob size

Live projects count

2023 Mar 24 — 2026 Oct 20

7 Projects
7.29% scaling market share

Ecosystem Token

Polygon Ecosystem Token

Polygon Ecosystem Token

POL

The POL token is used for governance across the Polygon ecosystem, including Polygon PoS and Agglayer chains. It also secures the Polygon PoS network and functions as a gas token on the chain.


Price

$0.094.07%

Market Cap

$1.00 B3.97%

Circulating Supply

10.63 B POL0.04%

Milestones & Incidents

202420252026

2026 Sep 23 • Silicon

Migration to Pessimistic Proofs

Silicon stops validating the full L2 state and moves to bridge accounting proofs.

32 of 32
Learn more

RaaS Providers

ConduitConduit
1 OF 3
Used by

Ecosystem Updates

Explore the latest Ecosystem Updates


#
name
Risks
Proof system
stage
Total value secured
7D%
Past day UOPS
7D%
1
X Layer logo
Risk analysis
Sequencer Failure
Self sequence
State Validation
Fraud proofs (1R, ZK)
Data Availability
Onchain
Exit Window
None
Proposer Failure
Cannot withdraw
OptimisticThis project is based on OP Stack's code base.This project is based on the Agglayer CDK code base.
OP Succinct Lite
n/a
$169.59 M36.4%
97.6% with additional trust assumptions
15.0536.3%
2
Katana logo
Risk analysis
Sequencer Failure
Self sequence
State Validation
Validity proofs (ST, SN)
Data Availability
Onchain
Exit Window
None
Proposer Failure
Cannot withdraw
ValidityThis project is based on the Agglayer CDK code base.This project is based on OP Stack's code base.
SP1 Turbo
Stage 0
Full training wheels

The requirement for available node software is under review
Items missing for Stage 1
  • Compromising ≥75% of the Security Council should be the only way (other than bugs) for a rollup to indefinitely block an L2→L1 message (e.g. a withdrawal) or push an invalid L2→L1 message (e.g. an invalid withdrawal) with a <7d exit window.
Please mind, stages do not reflect project security
$51.95 M3.82%
52.6% with additional trust assumptions
1.34301%
3
Lumia Prism logo
Risk analysis
Sequencer Failure
No mechanism
State Validation
None
Data Availability
External
Exit Window
None
Proposer Failure
Cannot withdraw
NoneThis project is based on the Agglayer CDK code base.
n/a
$14.61 M11.3%
0.00% with additional trust assumptions
<0.0162.8%
4
Haust Network logo
Risk analysis
Sequencer Failure
No mechanism
State Validation
None
Data Availability
External
Exit Window
None
Proposer Failure
Cannot withdraw
NoneThis project is based on the Agglayer CDK code base.
n/a
$10.67 M0.18%
0.00% with additional trust assumptions
0.016.46%
5
Silicon logo
Risk analysis
Sequencer Failure
No mechanism
State Validation
None
Data Availability
External
Exit Window
None
Proposer Failure
Cannot withdraw
NoneThis project is based on the Agglayer CDK code base.
n/a
$9.54 M3.12%
0.00% with additional trust assumptions
<0.012.49%
6
Polygon zkEVM logo
Risk analysis
Sequencer Failure
No mechanism
State Validation
None
Data Availability
External
Exit Window
None
Proposer Failure
Cannot withdraw
NoneThis project is based on the Agglayer CDK code base.
n/a
$9.46 M1.29%
18.5% with additional trust assumptions
0.000.00%
7
Pentagon Chain logo
Risk analysis
Sequencer Failure
No mechanism
State Validation
None
Data Availability
External
Exit Window
None
Proposer Failure
Cannot withdraw
NoneThis project is based on the Agglayer CDK code base.
n/a
$2.15 M1.17%
0.00% with additional trust assumptions
<0.0192.3%